Coach Position Features How it Works FAQ Download App
07360 • BHAGAT KI KOTHI to SSS HUBBALLI JN

07360 BGKT UBL SPL Coach Position

Check the coach position and seat layout of Train 07360 BGKT UBL SPL online with CoachMitra. Find your coach location easily and plan your boarding hassle-free before your journey.

BGKT BHAGAT KI KOTHI 07:50
31h 25m
UBL SSS HUBBALLI JN 15:15
22 Coaches
Runs: Tue
07360 Coach Sequence Map Engine Position: Front
ENGINE
LPR 1
LPR
ME1 2
AC 3 Tier Economy
B16 3
AC 3 Tier
B15 4
AC 3 Tier
B14 5
AC 3 Tier
B13 6
AC 3 Tier
B12 7
AC 3 Tier
B11 8
AC 3 Tier
B10 9
AC 3 Tier
B9 10
AC 3 Tier
B8 11
AC 3 Tier
B7 12
AC 3 Tier
B6 13
AC 3 Tier
B5 14
AC 3 Tier
B4 15
AC 3 Tier
B3 16
AC 3 Tier
B2 17
AC 3 Tier
B1 18
AC 3 Tier
A2 19
AC 2 Tier
A1 20
AC 2 Tier
LPR 21
LPR
Engine
AC 1A
AC 2A
AC 3A
AC 3E
Executive CC
Chair Car
Sleeper
2S
General
SLR
Generator
Pantry
Vistadome
Parcel
Special
Other

07360 Time Table

StationArr.Dep.HaltDist.Day
BHAGAT KI KOTHI (BGKT) -- 07:50 -- 0 km 1
LUNI JN (LUNI) 08:16 08:18 2h 0m 29 km 1
PALI MARWAR (PMY) 08:42 08:47 5h 0m 70 km 1
MARWAR JN (MJ) 09:30 09:35 5h 0m 100 km 1
FALNA (FA) 10:23 10:25 2h 0m 167 km 1
PINDWARA (PDWA) 11:04 11:06 2h 0m 222 km 1
ABU ROAD (ABR) 11:55 12:05 10h 0m 266 km 1
PALANPUR JN (PNU) 13:00 13:02 2h 0m 318 km 1
MAHESANA JN (MSH) 13:53 13:55 2h 0m 383 km 1
AHMEDABAD JN (ADI) 15:25 15:30 5h 0m 452 km 1
VADODARA JN (BRC) 17:50 18:00 10h 0m 552 km 1
SURAT (ST) 20:07 20:12 5h 0m 681 km 1
VALSAD (BL) 21:08 21:10 2h 0m 749 km 1
VAPI (VAPI) 21:33 21:35 2h 0m 774 km 1
PALGHAR (PLG) 22:35 22:37 2h 0m 857 km 1
VASAI ROAD (BSR) 23:05 23:15 10h 0m 896 km 1
KALYAN JN (KYN) 00:17 00:20 3h 0m 948 km 2
PUNE JN (PUNE) 03:05 03:15 10h 0m 1087 km 2
SATARA (STR) 05:45 05:47 2h 0m 1232 km 2
KARAD (KRD) 06:58 07:00 2h 0m 1290 km 2
SANGLI (SLI) 08:08 08:10 2h 0m 1358 km 2
MIRAJ JN (MRJ) 08:40 08:50 10h 0m 1365 km 2
GHATPRABHA (GPB) 10:00 10:02 2h 0m 1445 km 2
BELAGAVI (BGM) 11:30 11:35 5h 0m 1503 km 2
DHARWAR (DWR) 13:58 14:00 2h 0m 1624 km 2
SSS HUBBALLI JN (UBL) 15:15 -- -- 1644 km 2

What Is a Train Coach Position and Why Does It Matter?

A train coach position refers to the specific sequence of carriages (coaches) relative to the engine. For 07360 BGKT UBL SPL, knowing the coach position is crucial because Indian railway platforms are often long. By knowing if your coach (like B1, A1, or S1) is near the engine or at the rear, you can save yourself from a last-minute sprint across the platform when the train arrives.

Simple Steps to Check the Coach Position of 07360 Online?

Checking the coach layout for BGKT UBL SPL is easy with CoachMitra:

  • Step 1: Enter the train number 07360 in the search bar.
  • Step 2: View the visual sequence map which shows the 23 coaches in order.
  • Step 3: Note the "Distance from Engine" to identify if you need to stand at the start, middle, or end of the platform.

Things to Consider While Checking Train Coach Position

While the coach sequence for 07360 is generally stable, always keep these three things in mind:

  • Engine Direction: Ensure you check if the engine is at the front (standard for this route).
  • Rake Sharing: Some trains share coaches with others, which might slightly alter the sequence.
  • Platform Indicators: Match the coach code (e.g., H1) with the digital overhead displays on the platform for 100% accuracy.

Common Questions

How many stops does BGKT UBL SPL 07360 have?
07360 BGKT UBL SPL makes 26 scheduled station stops.
What’s the origin and destination station?
Starts from BHAGAT KI KOTHI (BGKT) and ends at SSS HUBBALLI JN (UBL).
Is 07360 a daily train?
It runs on: Tue.