Coach Position Features How it Works FAQ Download App
07716 • GORAKHPUR JN to CHARLAPALLI

07716 GKP CHZ SPL Coach Position

Check the coach position and seat layout of Train 07716 GKP CHZ SPL online with CoachMitra. Find your coach location easily and plan your boarding hassle-free before your journey.

GKP GORAKHPUR JN 08:00
39h 30m
CHZ CHARLAPALLI 23:30
0 Coaches
Runs: Wed
07716 Coach Sequence Map Engine Position: Front
Engine
AC 1A
AC 2A
AC 3A
AC 3E
Executive CC
Chair Car
Sleeper
2S
General
SLR
Generator
Pantry
Vistadome
Parcel
Special
Other

07716 Time Table

StationArr.Dep.HaltDist.Day
GORAKHPUR JN (GKP) -- 08:00 -- 0 km 1
BASTI (BST) 09:45 09:50 5h 0m 65 km 1
GONDA JN (GD) 11:25 11:30 5h 0m 154 km 1
BARABANKI JN (BBK) 13:23 13:25 2h 0m 243 km 1
LUCKNOW NR (LKO) 15:00 15:10 10h 0m 271 km 1
KANPUR CENTRAL (CNB) 17:05 17:10 5h 0m 345 km 1
POKHRAYAN (PHN) 18:03 18:05 2h 0m 404 km 1
ORAI (ORAI) 18:43 18:45 2h 0m 452 km 1
V LAKSHMIBAIJHS (VGLJ) 20:55 21:00 5h 0m 566 km 1
BINA JN (BINA) 23:35 23:40 5h 0m 718 km 1
RANI KAMALAPATI (RKMP) 01:50 01:55 5h 0m 863 km 2
NAGPUR (NGP) 10:55 11:00 5h 0m 1245 km 2
CHANDRAPUR (CD) 13:55 13:58 3h 0m 1443 km 2
BALHARSHAH (BPQ) 14:40 14:45 5h 0m 1457 km 2
SIRPUR KAGAZNGR (SKZR) 16:23 16:25 2h 0m 1526 km 2
MANCHIRYAL (MCI) 17:03 17:05 2h 0m 1584 km 2
KAZIPET JN (KZJ) 19:08 19:20 12h 0m 1691 km 2
CHARLAPALLI (CHZ) 23:30 -- -- 1810 km 2

What Is a Train Coach Position and Why Does It Matter?

A train coach position refers to the specific sequence of carriages (coaches) relative to the engine. For 07716 GKP CHZ SPL, knowing the coach position is crucial because Indian railway platforms are often long. By knowing if your coach (like B1, A1, or S1) is near the engine or at the rear, you can save yourself from a last-minute sprint across the platform when the train arrives.

Simple Steps to Check the Coach Position of 07716 Online?

Checking the coach layout for GKP CHZ SPL is easy with CoachMitra:

  • Step 1: Enter the train number 07716 in the search bar.
  • Step 2: View the visual sequence map which shows the 23 coaches in order.
  • Step 3: Note the "Distance from Engine" to identify if you need to stand at the start, middle, or end of the platform.

Things to Consider While Checking Train Coach Position

While the coach sequence for 07716 is generally stable, always keep these three things in mind:

  • Engine Direction: Ensure you check if the engine is at the front (standard for this route).
  • Rake Sharing: Some trains share coaches with others, which might slightly alter the sequence.
  • Platform Indicators: Match the coach code (e.g., H1) with the digital overhead displays on the platform for 100% accuracy.

Common Questions

How many stops does GKP CHZ SPL 07716 have?
07716 GKP CHZ SPL makes 18 scheduled station stops.
What’s the origin and destination station?
Starts from GORAKHPUR JN (GKP) and ends at CHARLAPALLI (CHZ).
Is 07716 a daily train?
It runs on: Wed.