Coach Position Features How it Works FAQ Download App
20162 • JABALPUR to PUNE JN

20162 JBP PUNE Coach Position

Check the coach position and seat layout of Train 20162 JBP PUNE online with CoachMitra. Find your coach location easily and plan your boarding hassle-free before your journey.

JBP JABALPUR 13:50
16h 35m
PUNE PUNE JN 06:25
18 Coaches
Runs: Sun
20162 Coach Sequence Map Engine Position: Front
ENGINE
SLRD 1
SLRD
B5 2
AC 3 Tier
B4 3
AC 3 Tier
B3 4
AC 3 Tier
B2 5
AC 3 Tier
B1 6
AC 3 Tier
A2 7
AC 2 Tier
A1 8
AC 2 Tier
S8 9
Sleeper Class
S7 10
Sleeper Class
S6 11
Sleeper Class
S5 12
Sleeper Class
S4 13
Sleeper Class
S3 14
Sleeper Class
S2 15
Sleeper Class
S1 16
Sleeper Class
SLRD 17
SLRD
Engine
AC 1A
AC 2A
AC 3A
AC 3E
Executive CC
Chair Car
Sleeper
2S
General
SLR
Generator
Pantry
Vistadome
Parcel
Special
Other

20162 Time Table

StationArr.Dep.HaltDist.Day
JABALPUR (JBP) -- 13:50 -- 0 km 1
MADAN MAHAL (MML) 14:00 14:02 2h 0m 4 km 1
NARSINGHPUR (NU) 14:58 15:00 2h 0m 85 km 1
PIPARIYA (PPI) 16:03 16:05 2h 0m 178 km 1
ITARSI JN (ET) 17:20 17:30 10h 0m 246 km 1
HARDA (HD) 18:16 18:18 2h 0m 321 km 1
BURHANPUR (BAU) 20:45 20:46 1h 0m 498 km 1
BHUSAVAL JN (BSL) 21:45 21:50 5h 0m 553 km 1
MANMAD JN (MMR) 00:10 00:15 5h 0m 737 km 2
KOPARGAON (KPG) 01:12 01:15 3h 0m 778 km 2
BELAPUR (BAP) 01:57 02:00 3h 0m 822 km 2
AHILYANAGAR (ANG) 02:57 03:00 3h 0m 889 km 2
DAUND CHORD LIN (DDCC) 04:33 04:35 2h 0m 971 km 2
PUNE JN (PUNE) 06:25 -- -- 1044 km 2

What Is a Train Coach Position and Why Does It Matter?

A train coach position refers to the specific sequence of carriages (coaches) relative to the engine. For 20162 JBP PUNE, knowing the coach position is crucial because Indian railway platforms are often long. By knowing if your coach (like B1, A1, or S1) is near the engine or at the rear, you can save yourself from a last-minute sprint across the platform when the train arrives.

Simple Steps to Check the Coach Position of 20162 Online?

Checking the coach layout for JBP PUNE is easy with CoachMitra:

  • Step 1: Enter the train number 20162 in the search bar.
  • Step 2: View the visual sequence map which shows the 23 coaches in order.
  • Step 3: Note the "Distance from Engine" to identify if you need to stand at the start, middle, or end of the platform.

Things to Consider While Checking Train Coach Position

While the coach sequence for 20162 is generally stable, always keep these three things in mind:

  • Engine Direction: Ensure you check if the engine is at the front (standard for this route).
  • Rake Sharing: Some trains share coaches with others, which might slightly alter the sequence.
  • Platform Indicators: Match the coach code (e.g., H1) with the digital overhead displays on the platform for 100% accuracy.

Common Questions

How many stops does JBP PUNE 20162 have?
20162 JBP PUNE makes 14 scheduled station stops.
What’s the origin and destination station?
Starts from JABALPUR (JBP) and ends at PUNE JN (PUNE).
Is 20162 a daily train?
It runs on: Sun.