Coach Position Features How it Works FAQ Download App
03225 • DANAPUR to CHARLAPALLI

03225 DNR CHZ SPL Coach Position

Check the coach position and seat layout of Train 03225 DNR CHZ SPL online with CoachMitra. Find your coach location easily and plan your boarding hassle-free before your journey.

DNR DANAPUR 20:50
32h 25m
CHZ CHARLAPALLI 05:15
23 Coaches
Runs: Thu
03225 Coach Sequence Map Engine Position: Front
ENGINE
LPR 1
LPR
GEN 2
Unreserved General Class
S1 3
Sleeper Class
S2 4
Sleeper Class
S3 5
Sleeper Class
S4 6
Sleeper Class
B1 7
AC 3 Tier
B2 8
AC 3 Tier
B3 9
AC 3 Tier
B4 10
AC 3 Tier
B5 11
AC 3 Tier
B6 12
AC 3 Tier
B7 13
AC 3 Tier
M1 14
AC 3 Tier Economy
M2 15
AC 3 Tier Economy
M3 16
AC 3 Tier Economy
M4 17
AC 3 Tier Economy
M5 18
AC 3 Tier Economy
M6 19
AC 3 Tier Economy
M7 20
AC 3 Tier Economy
GEN 21
Unreserved General Class
LPR 22
LPR
Engine
AC 1A
AC 2A
AC 3A
AC 3E
Executive CC
Chair Car
Sleeper
2S
General
SLR
Generator
Pantry
Vistadome
Parcel
Special
Other

03225 Time Table

StationArr.Dep.HaltDist.Day
DANAPUR (DNR) -- 20:50 -- 0 km 1
ARA JN (ARA) 21:23 21:25 2h 0m 40 km 1
BUXAR (BXR) 22:10 22:12 2h 0m 109 km 1
DD UPADHYAYA JN (DDU) 00:10 00:20 10h 0m 203 km 2
PRAYAGRAJCHEOKI (PCOI) 03:20 03:25 5h 0m 346 km 2
MANIKPUR (MKP) 05:50 05:52 2h 0m 438 km 2
SATNA (STA) 07:00 07:05 5h 0m 516 km 2
KATNI (KTE) 08:35 08:40 5h 0m 614 km 2
JABALPUR (JBP) 10:00 10:10 10h 0m 705 km 2
ITARSI JN (ET) 13:30 13:40 10h 0m 950 km 2
NAGPUR (NGP) 17:55 18:05 10h 0m 1247 km 2
BALHARSHAH (BPQ) 22:15 22:25 10h 0m 1458 km 2
SIRPUR KAGAZNGR (SKZR) 23:15 23:17 2h 0m 1528 km 2
BELLAMPALLI (BPA) 23:55 23:56 1h 0m 1566 km 2
RAMAGUNDAM (RDM) 00:22 00:24 2h 0m 1600 km 3
PEDDAPALLI JN (PDPL) 00:42 00:44 2h 0m 1617 km 3
KAZIPET JN (KZJ) 02:00 02:02 2h 0m 1692 km 3
CHARLAPALLI (CHZ) 05:15 -- -- 1812 km 3

What Is a Train Coach Position and Why Does It Matter?

A train coach position refers to the specific sequence of carriages (coaches) relative to the engine. For 03225 DNR CHZ SPL, knowing the coach position is crucial because Indian railway platforms are often long. By knowing if your coach (like B1, A1, or S1) is near the engine or at the rear, you can save yourself from a last-minute sprint across the platform when the train arrives.

Simple Steps to Check the Coach Position of 03225 Online?

Checking the coach layout for DNR CHZ SPL is easy with CoachMitra:

  • Step 1: Enter the train number 03225 in the search bar.
  • Step 2: View the visual sequence map which shows the 23 coaches in order.
  • Step 3: Note the "Distance from Engine" to identify if you need to stand at the start, middle, or end of the platform.

Things to Consider While Checking Train Coach Position

While the coach sequence for 03225 is generally stable, always keep these three things in mind:

  • Engine Direction: Ensure you check if the engine is at the front (standard for this route).
  • Rake Sharing: Some trains share coaches with others, which might slightly alter the sequence.
  • Platform Indicators: Match the coach code (e.g., H1) with the digital overhead displays on the platform for 100% accuracy.

Common Questions

How many stops does DNR CHZ SPL 03225 have?
03225 DNR CHZ SPL makes 18 scheduled station stops.
What’s the origin and destination station?
Starts from DANAPUR (DNR) and ends at CHARLAPALLI (CHZ).
Is 03225 a daily train?
It runs on: Thu.